A restump in Ipswich valued over $20,000 carries a deposit of 5% at most
By Artigellence ·
In Ipswich, as everywhere in Queensland, a contractor may ask for a deposit of at most 10% of the contract price on work valued from $3,301 to $19,999, and at most 5% on work valued at more than $20,000. QBCC says you are not obliged to pay a larger deposit, and that an excess you do pay cannot be recovered through a home warranty claim for a refund of deposit. Check which side of the line a restump quote sits before you pay anything.
Call (07) 3524 0616
What QBCC sets as the maximum deposit
QBCC's page on deposits and progress payments ties the maximum deposit to the value of the work. For work valued at $3,300 or less it is 20%. From $3,301 to $19,999 it is 10% of the contract price, which the page calls a level 1 contract. For work valued at more than $20,000 it is 5%, a level 2 contract.
The page gives one exception. A deposit of up to 20% is allowed where substantial customised work or prefabrication is done away from the building site and makes up more than 50% of the total contract price. Its examples are made-to-measure items such as kitchen cabinetry or cladding. If a restump quote relies on that exception, ask the contractor which part of the job is built off site.
Where a restump quote sits against the line
Whether a restump is a level 1 or a level 2 contract depends on the house, so read the contract price before you read the deposit. QBCC writes its two bands as $3,301 to $19,999 and more than $20,000, which leaves a contract priced at exactly $20,000 in neither band on that page. If a quote sits on the line, ask the contractor which cap they are applying and why.
The same figure matters for the cooling-off period. QBCC's cooling-off page says the period of five business days begins the day after you receive a signed copy of the entire contract, including any plans and specifications, and, for contracts valued at $20,000 or more, a copy of the QBCC Consumer Building Guide. If the contractor is late with any of those documents, the period runs later.
If you are asked for a larger deposit
QBCC's advice is to query it with the contractor first. If they persist, you are not obliged to pay more, and the page says the request may be a red flag.
The reason to hold the line is the Queensland Home Warranty Scheme. Refunding a deposit when work has not started is one of the losses the scheme covers, and QBCC gives the maximum as $200,000 for each category of loss. But the deposit page is plain that if you pay more than the lawful deposit, you are not entitled to recover the excess in a claim for refund of deposit.
After the deposit, pay against the work
Progress payments follow the same logic. The contractor can't claim more than 50% of the contract price, including the deposit, until at least 50% of the work onsite has been completed. QBCC recommends linking each payment to a clearly defined stage you can inspect, and warns that paying more than the contract states, or paying before the due date, reduces the protection available to you under the scheme.
Artigellence is the marketing business that operates this site and writes its articles. It does not carry out the work described.
Thanks — we have your enquiry. Someone will be in touch shortly. Prefer to talk now? Call (07) 3524 0616.
Last reviewed · Updated · First published